Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
RFPQ# 26.0125 Bremner Water Supply Main Construction
Strathcona County · Alberta, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- AB-2026-06984 (26.0125)
- Organisme émetteur
- Strathcona County · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- RFPQ# 26.0125 Bremner Water Supply Main Construction
- Source
- Alberta Purchasing
- Identifiant de la source
- AB-2026-06984
Détails
- Lieu
- Alberta, Canada
Résumé
RFPQ documents should be obtained from the Bonfire portal at https://strathcona.bonfirehub.ca. The County is seeking qualified respondents for a water supply line installation for the Bremner Development Area. This work includes the open cut and trenchless installation of a 400 mm diameter water supply main between an existing County water line and the future Bremner Northwest Reservoir/Pumphouse, as well as a valve chamber to the north of the Reservoir/Pumphouse site. The purpose of this RFPQ is to pre-qualify and short-list appropriate respondents, to respond to an anticipated Request for Quotation (“RFQ”) to provide the Deliverables. The County anticipates issuing the RFQ in November 2026. This date is tentative only and may be changed at any time by the County in its sole discretion. Refer to the attached 26.0125 - Submission Instructions. Commodity: Heavy construction services, Water main construction service, Underground utilities construction service, Land preparation services, Trenching service
Description
RFPQ documents should be obtained from the Bonfire portal at https://strathcona.bonfirehub.ca. The County is seeking qualified respondents for a water supply line installation for the Bremner Development Area. This work includes the open cut and trenchless installation of a 400 mm diameter water supply main between an existing County water line and the future Bremner Northwest Reservoir/Pumphouse, as well as a valve chamber to the north of the Reservoir/Pumphouse site. The purpose of this RFPQ ...
Dates
- Publication
- 20 octobre 2026 à 10 h 00
- Date de clôture
- 17 novembre 2026 à 09 h 00
Comment soumissionner
Classification
Catégories NIBS
Catégorie normalisée
Source: Alberta Purchasing
Dernière modification : 2026-11-25 04 h 17 min 13 s
Actualisation toutes les 2 heures