Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
0000336734

River Road Outfall Rehabilitation

The City of Winnipeg · Winnipeg, Manitoba, Canada

Cet appel d’offres a fermé le 16 novembre 2026 à 19 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
0000336734
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
River Road Outfall Rehabilitation
Identifiant de la source
0000336734

Détails

Lieu
Winnipeg, Manitoba, Canada

Résumé

Description D3. SCOPE OF WORK D3.1 The Work to be done under the Contract shall consist of: (a) 106 River Road Outfall (S-MA70041564) (i) Removal of (+/-) 40.0 m of existing 1200 mm diameter CMP and (+/-) 4.88 m of existing 1050 mm diameter concrete pipe and replacing with (+/-) 44.9 m of 1200 mm diameter (2.8 mm) c/w polymer coating (ii) Reconnection of existing 1050 mm concrete pipe to new 1200 mm CMP with reinforced concrete collar (iii) Installation of temporary shoring (as required) (iv) Installation of two (2) - 1200 mm diameter internal slip joints (v) Remove existing geotechnical instrumentation (as required) (vi) Install new geotechnical instrumentation (as required) (vii) Installation of thirty-two (32) – 2.44 m diameter rockfill columns (viii) Installation of thirty-four (34) – 2.13 m diameter rockfill columns (ix) Installation of rockfill riprap (x) Riverbank regrading (xi) Sewer Inspection (xii) Site Restoration See more

Description

Description D3. SCOPE OF WORK D3.1 The Work to be done under the Contract shall consist of: (a) 106 River Road Outfall (S-MA70041564) (i) Removal of (+/-) 40.0 m of existing 1200 mm diameter CMP and (+/-) 4.88 m of existing 1050 mm diameter concrete pipe and replacing with (+/-) 44.9 m of 1200 mm diameter (2.8 mm) c/w polymer coating (ii) Reconnection of existing 1050 mm concrete pipe to new 1200 mm CMP with reinforced concrete collar (iii) Installation of temporary shoring (as required) (iv) In...

Dates

Publication
3 novembre 2026 à 19 h 00
Date de clôture
16 novembre 2026 à 19 h 00

Classification

Catégorie normalisée

Construction & Infrastructure

Source: MERX Manitoba

Dernière modification : 2026-11-25 04 h 17 min 13 s

Actualisation toutes les 2 heures