Bay 1E Slab Modification
Saskatchewan Research Council · Saskatchewan, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 2526-041
- Organisme émetteur
- Saskatchewan Research Council · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Bay 1E Slab Modification
- Source
- SaskTenders
- Identifiant de la source
- d569599c-7c5c-4f5d-9b52-93ba3c60499c
Détails
- Lieu
- Saskatchewan, Canada
Résumé
SRC operates in a variety of work environments ranging from offices to laboratories, to processing plants and field locations throughout the province of Saskatchewan.- SRC requires the installation of Sloped slab, Trench Drains and Sump Pit for their Bay 1E operations at 820 51st Street Saskatoon location.WHO WE ARE:The Saskatchewan Research Council (SRC) is Canada’s second largest research and technology organization. SRC focuses its efforts on the mining, minerals, agriculture and energy sectors, and the environmental considerations that are important across each sector. With about 400 employees, $220 million in annual revenue and over 75 years of RD&D experience, SRC has 1,500 clients in 27 countries around the world. We help clients from across the world solve technology problems, make improvements, seize opportunities, maintain competitiveness, increase productivity, and develop new markets. This scope shall be executed as a single-source Design-Build contract. The successful Respondent shall be fully responsible for complete professional engineering design, preparation of sealed construction documents, procurement, construction execution and delivery of a fully functional and code-compliant system.• The Contractor shall supply all necessary labour, materials, equipment, supervision and engineering services required to complete the Work.• The work shall include but not be limited to:o Professional engineering design review and sealing of all required documentso Applying and Obtaining all necessary permitso Supply of all materials, labour, equipment, construction, installation, testing and commissioningo Deficiency correction and closeout documentationo Safety services during constructiono Warranty services (minimum 12 months unless otherwise specified)o Collection, removal and proper disposal of all construction debris, surplus materials, packaging and waste generated as part of the Work.o Removal and proper disposal of all excavated materials not required for backfill.o Protection of adjacent areas from damage during construction activities.o Final site cleanup upon completion of the Work leaving the area in a clean and safe condition acceptable to SRC.• The contractor shall provide a qualified site supervisor who shall be present as required to manage and coordinate the Work.• The site supervisor shall be an employee or direct representative of the Contractor.• A subcontractor shall not be designated as the site supervisor.• The contractor remains fully responsible for the performance, supervision and coordination of all subcontractor
Description
SRC operates in a variety of work environments ranging from offices to laboratories, to processing plants and field locations throughout the province of Saskatchewan.- SRC requires the installation of Sloped slab, Trench Drains and Sump Pit for their Bay 1E operations at 820 51st Street Saskatoon location.WHO WE ARE:The Saskatchewan Research Council (SRC) is Canada’s second largest research and technology organization. SRC focuses its efforts on the mining, minerals, agriculture and energy secto...
Dates
- Publication
- 3 mars 2026 à 09 h 00
- Date de clôture
- 17 mars 2026 à 10 h 00