Provision of UPS - MEICA-UPS-01

BIP SOLUTIONS LIMITED · Royaume-Uni

Cet appel d’offres a fermé le 25 novembre 2026 à 09 h 55. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureFédéral

Renseignements généraux

Numéro de référence
C4N123459269
Palier de gouvernement
Federal
Type d’appel d’offres
Construction & Infrastructure
Titre
Provision of UPS - MEICA-UPS-01
Identifiant de la source
0332f6e9-88ac-4a73-925c-74c46b00c7ca-922036

Détails

Lieu
Royaume-Uni

Résumé

The Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green. 1. Technical Requirements Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable. Requirement Stoneleigh Canley Brook Burton Green Battery sizing load 35 kW 17 kW 70 kW Connected design load 31 kW TBC 66 kW Protection breaker 100 A 100 A 250 A Separate static switch N/A N/A 400 A, 400 V Each UPS shall provide an output fault current of 987 A for 200 ms. Supplier submissions shall demonstrate compatibility with the project protection requirements. 2. Batteries Provide complete VRLA battery systems, including racks/enclosures, interconnections, isolation and protection, delivering 90 minutes' autonomy at the specified battery sizing load. Batteries shall recharge to 95% within 900 minutes. Submit sizing and recharge calculations. 3. Transformers and Ancillary Equipment Provide 250 kVA, 1:1, Dzn0 input and output isolation transformers, together with ATS, static switching and external maintenance bypass arrangements required by the approved site-specific drawings. ATS shall be 400 A, four-pole where indicated. Include all interconnecting cables, battery cables, protective devices and terminations identified as the UPS supplier's responsibility. Coordinate interfaces with incoming supplies and UPS switchboards. 4. Monitoring Provide BMS interfaces for battery DC voltage, charge percentage, battery alarms/faults and charger status/alarms. Include communications protocols, interface hardware and point schedules for the UPS, ATS and UPS switchboard, with interface testing. 5. Delivery and Coordination Scheduled UPS cabinet dimensions are 1,200 W x 1,996 H x 1,100 D mm. Confirm complete equipment footprints, weights, clearances and delivery requirements before manufacture. 6. Testing and Handover Include FAT, commissioning, SAT and resistive load bank testing, with all temporary equipment, connections and removal. Demonstrate capacity, autonomy, recharge, redundancy, transfer/bypass operation, alarms and communications. Provide evidence of fault-current performance. Submit equipment drawings, schematics, protection data, test procedures/results, commissioning records, as-built information and O&M manuals. Suppliers shall identify proposed equipment and deviations. Confirm the missing Canley Brook design load, whether Burton Green loads apply per UPS, and site-specific equipment quantities and supply boundaries before manufacture. Additional information: Please review attached schematic and narrative specification.

Description

The Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green. 1. Technical Requirements Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable. Requirement Stoneleigh Canley Brook Burton Green Battery sizing...

Dates

Publication
19 novembre 2026 à 09 h 23
Date de clôture
25 novembre 2026 à 09 h 55

Valeur estimée

$500K GBP