Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
TfGM Supply, Installation, and Maintenance of Over height Vehicle Monitoring Equipment 2026
Transport For Greater Manchester · Royaume-Uni
Temps restant pour soumissionner
Attribué
Renseignements généraux
- Numéro de référence
- 2026 / 137
- Organisme émetteur
- Transport For Greater Manchester · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- TfGM Supply, Installation, and Maintenance of Over height Vehicle Monitoring Equipment 2026
- Source
- Contracts Finder (UK)
- Identifiant de la source
- 237119de-6a3d-472c-9801-30b76058cf5e-922394
Détails
- Lieu
- Royaume-Uni
Résumé
have strategic oversight and management of a Key Route Network that constitutes almost 400 miles of Public Highway. It is the responsibility of TfGM, working with the ten Greater Manchester Local Authorities, to strive to help minimise delays, reduce congestion and improve safety across the region's highways. TfGM has recognised the number of low bridges across the region and the risks that collisions of high vehicles with bridges pose to both the integrity of bridges and to the safety of the vehicle occupants alongside other road users. TfGM need x2 such installations to be urgently installed at sites in Salford and in Bolton. TfGM have therefore chosen to direct award the installation of this equipment, including a 10 year warranty to the supplier noted. This direct award is via the RM6347 Transport Technology framework.
Description
have strategic oversight and management of a Key Route Network that constitutes almost 400 miles of Public Highway. It is the responsibility of TfGM, working with the ten Greater Manchester Local Authorities, to strive to help minimise delays, reduce congestion and improve safety across the region's highways. TfGM has recognised the number of low bridges across the region and the risks that collisions of high vehicles with bridges pose to both the integrity of bridges and to the safety of the ve...
Dates
- Publication
- 26 novembre 2026 à 09 h 13
- Date de clôture
- 2 novembre 2026 à 10 h 00
Valeur estimée
$350K GBP
Classification
Catégorie normalisée
Source: Contracts Finder (UK)
Dernière modification : 2026-11-28 16 h 46 min 24 s
Actualisation toutes les 2 heures