0000315497

Arlington Street - Asphalt Reconstruction McPhillips Street - Mill and Fill

The City of Winnipeg · Winnipeg, Manitoba, Canada

Cet appel d’offres a fermé le 10 mars 2026 à 20 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
0000315497
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
Arlington Street - Asphalt Reconstruction McPhillips Street - Mill and Fill
Identifiant de la source
0000315497

Détails

Lieu
Winnipeg, Manitoba, Canada

Résumé

Description D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of two parts: (a) Part 1 – City Funded Work (b) Part 2 – Federally and Provincially Funded Work. Part 1 – City Funded Work D2.2 Part 1 – City Funded Work shall consist of: (a) Asphalt Reconstruction and Associated Works (i) Arlington Street from Inkster Boulevard to Enniskillen Avenue (b) Sewer Repairs and Associated Works (i) Arlington Street from Inkster Boulevard to Enniskillen Avenue Part 2 – Federally and Provincially Funded Work D2.3 Part 2 – Federally and Provincially Funded Work shall consist of: (a) Asphalt Mill and Fill and Associated Works (i) McPhillips Avenue from Emes Road to North Point Boulevard D2.4 The major components of the Work are as follows: (a) Asphalt Reconstruction and Associated Works (i) Abandon existing catch basins and drainage inlets; (ii) Installation of catch basins and sewer service pipes; (iii) Installation of manhole; (iv) Installation of new 300mm combined sewer; (v) Removal of existing sidewalk; (vi) Removal of existing curb as required; (vii) Renewal of existing concrete sidewalk as required; (viii) Removal of existing pavement; (ix) Excavation; (x) Compaction of existing sub-grade; (xi) Placement of wicking geogrid composite (E20); (xii) Insulation of water mains; (xiii) Installation of sub drains; (xiv) Placement and compaction of sub-base material; (xv) Placement and compaction of base course material; (xvi) Construction of 150mm concrete pavement (reinforced); (xvii) Construction of barrier curb and reversed gutter for asphalt pavement (SD-200B), utilizing slip-form paving equipment; (xviii) Construction of barrier curb for asphalt pavement (SD-200A); (xix) Construction of modified barrier curb for asphalt pavement (SD-203C); (xx) Construction of lip curb for asphalt pavement (SD-202E); (xxi) Construction of curb ramp for asphalt pavement (SD-229F); (xxii) Renewal of existing curb as required; (xxiii) Placement and compaction of suitable site material as backfill behind barrier curb and reversed gutter; (xxiv) Placement and compaction of 50mm granular B behind barrier curb and modified barrier curb for asphalt pavements; (xxv) Grading of boulevards; (xxvi) Placement and compaction of topsoil; (xxvii) Placement of asphalt pavement (Type MS2, 60mm thickness); (xxviii) Installation of pavement repair fabric at gutter inlets and manholes (SD-220E and SD-220G); (xxix) Placement of asphalt pavement (Type MS1, 50mm thickness); (xxx) Placement of asphalt pavement tie-ins (Type MS2 and MS1); and (xxxi) Placement of sod. (b) Sewer Repairs and Associated Works (i) Pre-construction sewer and sewer service video inspection; (ii) External point repair of existing sewer main; (iii) Sewer service reconnection; (iv) Install new manhole and connect to existing sewer; (v) Post construction sewer and sewer service video inspection. (c) Asphalt Mill and Fill and Associated Works (i) Asphalt pavement removal; (ii) Re-grading existing ditch and side slopes; (iii) Excavation; (iv) Sub-grade compaction; (v) Placement of geotextile fabric; (vi) Preparation of existing shoulder; (vii) Placement and compaction of sub-base material; (viii) Placement of geogrid; (ix) Placement and compaction of base course material; (x) Milling existing asphalt pavement (1-50mm); (xi) Full depth concrete repairs of existing slabs and joints (200mm reinforced); (xii) Asphalt patching; (xiii) Renewal of existing curb as required; (xiv) Renewal of existing concrete bull-nose; (xv) Construction of 150mm concrete pavement (reinforced); (xvi) Construction of modified barrier curb; (xvii) Grading of boulevards; (xviii) Placement of asphalt pavement (Type MS1); (xix) Placement and compaction of topsoil; and (xx) Hydroseeding See more

Description

Description D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of two parts: (a) Part 1 – City Funded Work (b) Part 2 – Federally and Provincially Funded Work. Part 1 – City Funded Work D2.2 Part 1 – City Funded Work shall consist of: (a) Asphalt Reconstruction and Associated Works (i) Arlington Street from Inkster Boulevard to Enniskillen Avenue (b) Sewer Repairs and Associated Works (i) Arlington Street from Inkster Boulevard to Enniskillen Avenue Part 2 – Federally an...

Dates

Publication
24 février 2026 à 19 h 00
Date de clôture
10 mars 2026 à 20 h 00

Classification

Catégorie normalisée

Construction & Infrastructure

Source: MERX Manitoba

Dernière modification : 2026-09-02 12 h 08 min 52 s