All tenders
12363N26P4023

THE EXISTING PIPING AND CONTROL STRUCTURE AT BEAVER LAKE HAVE FAILED RESULTING IN THE WATER SURFACE ELEVATION DROPPING ALMOST 7-FT. EXISTING CORRUGATED METAL PIPING WILL BE REPLACED WITH REINFORCED CONCRETE PIPING. NEW FILTER DRAIN, PLUNGE POOL, AND

Forest Service · United States

This contract has been awarded. Browse open opportunities
View Source

Time Left to Bid

Awarded

AwardedConstruction & InfrastructureFederal

Basic information

Reference number
12363N26P4023
Government level
Federal
Solicitation type
Construction & Infrastructure
Title
THE EXISTING PIPING AND CONTROL STRUCTURE AT BEAVER LAKE HAVE FAILED RESULTING IN THE WATER SURFACE ELEVATION DROPPING ALMOST 7-FT. EXISTING CORRUGATED METAL PIPING WILL BE REPLACED WITH REINFORCED CONCRETE PIPING. NEW FILTER DRAIN, PLUNGE POOL, AND
Source ID
usa-12363N26P4023

Details

Location
United States

Description

THE EXISTING PIPING AND CONTROL STRUCTURE AT BEAVER LAKE HAVE FAILED RESULTING IN THE WATER SURFACE ELEVATION DROPPING ALMOST 7-FT. EXISTING CORRUGATED METAL PIPING WILL BE REPLACED WITH REINFORCED CONCRETE PIPING. NEW FILTER DRAIN, PLUNGE POOL, AND Awarded to: ZACH DAVIDSON EXCAVATION LLC Agency: Department of Agriculture Sub-agency: Forest Service Award type: PURCHASE ORDER

Dates

Publication
2026/08/14 12:00:00 AM UTC
Closing date
2027/01/31 12:00:00 AM UTC

Estimated value

$353K USD

Classification

Normalized category

Construction & Infrastructure

Source: USASpending (Federal)

Last updated 2026-09-02, 12:09:59 p.m.

Data refreshed every 2 hours