Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Fultonvale Elementary Junior High – Exterior Wall Repair
Elk Island Public Schools · Alberta, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- AB-2026-01600 (2026-010)
- Organisme émetteur
- Elk Island Public Schools · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Fultonvale Elementary Junior High – Exterior Wall Repair
- Source
- Alberta Purchasing
- Identifiant de la source
- AB-2026-01600
Détails
- Lieu
- Alberta, Canada
Résumé
.1 Work of this Contract comprises the following: .2 The abatement of the asbestos containing texture will be the responsibility of the Contractor. The Owner has allowed for and will pay for a total of ten (10) business days (excluding weekends) of air monitoring for the hazardous material abatement. The successful Contractor will be required to coordinate with the Owner’s air monitoring company for dates and times. The Contractor will be required to pay for any air monitoring required beyond ten (10) days, if required. .3 Sequence the work accordingly to ensure the Courtyard/play areas are the priority for completion, the front of the building will be the final location to be completed. .4 Complete the wall repairs as outlined including the removal and installation of new caulking at all exterior locations, removal and replacing of the brick, repairs to the corbel, and the supply and installation of new metal cladding/flashing. .5 Painting of the repaired brick along the west face of the building. .6 Contractor is required to provide and maintain a perimeter fence for the duration of the work. Appropriate signage must be provided. The adjacent playgrounds are not within the Elk Island Public School’s jurisdiction. The playgrounds will remain accessible to the public for the duration of the project. The Contractor is to ensure the safety of the public and school occupants with appropriate barricades and signage while the work is being performed. Commodity: Structures and Building and Construction and Manufacturing Components and Supplies, Exterior finishing materials, Building and Facility Construction and Maintenance Services, Facility maintenance and repair services
Description
.1 Work of this Contract comprises the following: .2 The abatement of the asbestos containing texture will be the responsibility of the Contractor. The Owner has allowed for and will pay for a total of ten (10) business days (excluding weekends) of air monitoring for the hazardous material abatement. The successful Contractor will be required to coordinate with the Owner’s air monitoring company for dates and times. The Contractor will be required to pay for any air monitoring required beyond t...
Dates
- Publication
- 24 février 2026 à 10 h 39
- Date de clôture
- 17 mars 2026 à 10 h 00
Comment soumissionner
Classification
Catégories NIBS
Catégorie normalisée
Source: Alberta Purchasing
Dernière modification : 2026-09-02 12 h 10 min 04 s
Actualisation toutes les 2 heures