Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
SX-NRPB-536698-CS-INDV

Administrative Assistant SWAMP

National Recovery Program Bureau · International

Cet appel d’offres a fermé le 24 mars 2026 à 20 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméServices professionnels et de consultationinternational

Renseignements généraux

Numéro de référence
SX-NRPB-536698-CS-INDV
Palier de gouvernement
international
Type d’appel d’offres
Professional & Consulting Services
Titre
Administrative Assistant SWAMP
Identifiant de la source
OP00430410

Détails

Lieu
International

Résumé

National Recovery Program Bureau TERMS OF REFERENCE Full-Time Administrative Assistant EDMP & SWaMP Individual Consultant Time-based (24 months) Background Following the devastation caused by hurricanes Irma and Maria in September 2017, the Government of Sint Maarten embarked on a large-scale recovery and reconstruction program, based on the principle of building back better. Since January 2018, the World Bank is assisting the Government of Sint Maarten. A significant part of Sint Maarten’s ongoing recovery and reconstruction program is financed through a Trust Fund financed by the Netherlands, managed by the World Bank and implemented by Sint Maarten. To support the implementation of the Trust Fund, the Government of Sint Maarten established the National Recovery Program Bureau (NRPB), which serves as the Project Implementation Unit (PIU) for the Government of Sint Maarten. About the Emergency Debris Management Project (EDMP) One of NRPB’s projects is the Emergency Debris Management Project (EDMP). This project was approved on December 21, 2018, and became effective on January 31, 2019. The project finances the management of debris from the hurricanes and reconstruction activities to facilitate recovery and reduce risks. Main activities include the Improvement of debris management operations at the municipal waste disposal sites, the vessel salvaging and removal in the Simpson Bay Lagoon, Mullet Pond, and removal of debris from their shoreline, the car wrecks collection and disposal, the debris clearance and disposal and the temporary debris storage and reduction (TDSR). For the implementation of this project, the NRPB works closely together with relevant line-ministries, including the Ministry of Public Housing, Spatial Planning, Environment, and Infrastructure (VROMI) and the Ministry of Public Health, Social Development and Labor (VSA). About the Wastewater Management Project (SWMP) The Wastewater Management Project implements a wide range of activities, in close collaboration with government counterparts and ministries, notably Ministry of Public Housing, Spatial Planning, Environment, and Infrastructure (hereinafter referred to as “VROMI”. The project consists of the improvement of the coverage and performance of the wastewater system in Sint Maarten. This will be done through the expansion of the existing sewerage network to enable the connection for residents and commercial enterprises, the rehabilitation of critical parts of the existing sewage system to improve its climate resilience and operational efficiency and the improvement of the wastewater treatment plant. Role of the Administrative Assistant The Project Assistant (hereinafter referred to as “The Assistant”) will provide administrative support to the Project Manager and technical teams. The Assistant will be responsible for administrative tasks and related services to support effective and efficient operations of the organization’s Emergency Debris Management Project (EDMP) and Sint Maarten Wastewater management Project (SWAMP). Key Duties and Responsibilities Under the direction of the EDMP/SWAMP Project Manager of the NRPB, the Assistant is expected to perform the following tasks: · Maintain accurate and up-to-date records of project documents, including but not limited to, contracts, invoices, payment certificates and advices. · Assist in the preparation of project related documents such as reports, presentations, official letters, and other documents by formatting, proofreading, and editing content as required. · Coordinate organization for events and meetings, workshops, training sessions, stakeholder consultations, field visits etc.: preparation of agendas, invitations, logistical arrangements, quotations, room reservations, transport, communications, etc. through Support Department · Support the preparation and submission of project progress reports, minutes, and related correspondence. · Record and distribute minutes of meetings and follow up on agreed actions. · Assist in compiling data and supporting evidence for project monitoring and evaluation (M&E) activities. · Provide logistical and administrative support during supervision missions, workshops and audits. · Develop, monitor and maintain a document registry for both projects · Develop and maintain the so called “Vault” for both projects · Performs periodic audits of files and records in the SharePoint of the respective projects, to ensure that all required documents are collected and filed appropriately. · In general, perform other tasks assigned by the Project Manager and the other Project team members. Contractual Arrangements. Duration of the Assignment and Performance A time-based contract is expected to be signed. The start date of the contract will be April 2026 or soon thereafter. The contract duration will be 24 months2, with the possibility of extension depending on approval of project extension and satisfac

Description

National Recovery Program Bureau TERMS OF REFERENCE Full-Time Administrative Assistant EDMP & SWaMP Individual Consultant Time-based (24 months) Background Following the devastation caused by hurricanes Irma and Maria in September 2017, the Government of Sint Maarten embarked on a large-scale recovery and reconstruction program, based on the principle of building back better. Since January 2018, the World Bank is assisting the Government of Sint Maarten. A significant part of Sint Maarten...

Dates

Publication
18 mars 2026 à 20 h 00
Date de clôture
24 mars 2026 à 20 h 00

Comment soumissionner

Classification

Catégorie normalisée

Professional & Consulting Services

Source: World Bank

Dernière modification : 2026-09-09 21 h 04 min 07 s

Actualisation toutes les 2 heures