Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Replacement of Boilers and Condensing Unit
City of Saskatoon · Saskatchewan, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- RFQ26-0075
- Organisme émetteur
- City of Saskatoon · Voir l'historique des attributions →
- Palier de gouvernement
- Municipal
- Type d’appel d’offres
- Facilities Management
- Titre
- Replacement of Boilers and Condensing Unit
- Source
- SaskTenders
- Identifiant de la source
- e9004d81-5b12-442c-8d21-52d4630655bf
Détails
- Lieu
- Saskatchewan, Canada
Résumé
The City of Saskatoon is inviting quotations from contractors for the provision of all labour, materials, equipment, and supervision necessary to supply and install two (2) boilers at the Commissary building, as well as one (1) condensing unit and One (1) evaporator coil for the air handling unit (AHU) in the Quarantine building at the Forestry Farm Park and Zoo site. All units are equipped with Building Management System (BMS) controls, which require the contractor to disconnect, retain, and reintegrate the controls with the new equipment. The functionality must be at least as good as, if not better than, that of the previous condensing unit and boilers. Solicitation documents for this procurement can be found onsaskatoon.bidsandtenders.caAll respondents must register on the City’s electronic bidding system at saskatoon.bidsandtenders.ca. This will enable the respondent to download the solicitation document, ask questions, receive addenda and email notifications, and submit their bid through the bidding system. Award notification will be posted to saskatoon.bidsandtenders.caSubmission Deadline: 2:00:59 p.m. Saskatchewan Time, Friday, March 6, 2026.
Description
The City of Saskatoon is inviting quotations from contractors for the provision of all labour, materials, equipment, and supervision necessary to supply and install two (2) boilers at the Commissary building, as well as one (1) condensing unit and One (1) evaporator coil for the air handling unit (AHU) in the Quarantine building at the Forestry Farm Park and Zoo site. All units are equipped with Building Management System (BMS) controls, which require the contractor to disconnect, retain, and re...
Dates
- Publication
- 19 février 2026 à 09 h 45
- Date de clôture
- 6 mars 2026 à 09 h 00
Documents
Classification
Catégorie normalisée
Source: SaskTenders
Dernière modification : 2026-09-02 12 h 10 min 13 s
Actualisation toutes les 2 heures