Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Project Implementation Consultant (PIC) for Technical Validation, Detailed Architectural and Engineering Design, and Construction Supervision of Luzon Schools - PIC 1
Department of Public Works and Highways · PH
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- PH-DPWH-CS-PIC1-RFP
- Palier de gouvernement
- international
- Type d’appel d’offres
- Professional & Consulting Services
- Titre
- Project Implementation Consultant (PIC) for Technical Validation, Detailed Architectural and Engineering Design, and Construction Supervision of Luzon Schools - PIC 1
- Source
- World Bank
- Identifiant de la source
- OP00440562
Détails
- Lieu
- PH
Résumé
REQUEST FOR EXPRESSIONS OF INTEREST Consulting Services for the Project Implementation Consultant (PIC) for the Technical Validation, Detailed Architectural and Engineering Design, and Construction Supervision of Luzon Schools – PIC 1 under IBRD Loan No. 97040-PH: Infrastructure for Safer and Resilient Schools (ISRS) Project Country: Philippines Name of Project: Infrastructure for Safer and Resilient Schools (ISRS) Project Loan No.: IBRD Loan No. 97040-PH Assignment Title: Contract ID No. 26CSZ005, Consulting Services for the Project Implementation Consultant (PIC) for the Technical Validation, Detailed Architectural and Engineering Design, and Construction Supervision of Luzon Schools – PIC 1 under IBRD Loan No. 97040-PH: Infrastructure for Safer and Resilient Schools (ISRS) Project Reference No.: PH-DPWH-CS-PIC1-RFP 1. The Republic of the Philippines (hereinafter called ”Borrower”) has received financing from the World Bank (the “Bank”) toward the cost of the Infrastructure for Safer and Resilient Schools (ISRS) Project, and intends to apply part of the proceeds for consulting services for the Project Implementation of the ISRS project. 2. The consulting services (“the Services”) being procured via this REOI includes the following summary of the key responsibilities expected under these Services: The consulting services are structured into two key phases: the Detailed Architectural and Engineering Design (DAED) Phase and the Construction Supervision (CS) Phase. These phases collectively cover the progression of the project from the development of complete, buildable design solutions to the actual implementation and delivery of the works. A. The Detailed Architectural and Engineering Design (DAED) Phase covers the full development of technical solutions for the project, starting from validation of site conditions up to the preparation of complete, procurement-ready design documents. This phase ensures that all interventions are technically sound, climate-resilient, and compliant with environmental and social safeguards, ultimately enabling smooth transition to procurement and construction. A.1 Inception and Planning A.2 Technical Validation and Assessment Outputs A.3 Environmental and Social Safeguards Deliverables A.4 Detailed Architectural and Engineering Design (DAED) A.5 Procurement Support and Bidding Documents A.6 Progress Monitoring and Reporting B. The Construction Supervision (CS) Phase focuses on ensuring that the approved designs are implemented correctly, efficiently, and in compliance with all technical, environmental, and contractual requirements. During this phase, the Consultant acts as the Client’s representative in overseeing construction, maintaining quality control, and ensuring that the completed works meet the intended standards prior to turnover. B.1 Pre-Construction Supervision B.2 Construction Monitoring and Supervision Reports B.3 Environmental, Social, Health, and Safety (ESHS) Compliance Monitoring B.4 Quality Control and Technical Support Outputs B.5 Completion, Acceptance, and Turnover Deliverables B.6 Defects Liability and Close-Out Reports The detailed Terms of Reference (TOR) can be access through this link: https://drive.google.com/drive/folders/19csDthvYbQsTt-LV5lEyMn7j56wcvhlh The type of Contract will be Lump-sum and Time-based and the Contract Duration will be 36 months. 3. The Department of Public Works and Highways (DPWH) now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are summarized below: The assignment will be undertaken by a firm consultant with established expertise and reputation in the fields of Detailed Architectural & Engineering Design and Construction Supervision for the Retrofitting or Construction of Buildings, and preparation and implementation of the ESMF instruments. A. Factors to consider for the required qualification of the Firm consultant are as follows A.1 CONSULTANCY SERVICES EXPERIENCE Must have completed minimum of two (2) similar consultancy service contracts within the last fifteen (15) years (from January 2011 up to the EOI submission deadline) involving ONLY Detailed Architectural and Engineering Design (DAED) AND Construction Supervision (CS) for Retrofitting/Construction of Buildings projects, or two (2) each of the above scopes. In cases where only one (1) similar consultancy service contract is completed/provided, the Firm may submit two (2) Other Related Consultancy Services contracts completed within the same 15-year period, involving ONLY Detailed Architectural and Engineering Design (DAED) AND Construction Supervision (CS) of ANY infrastructure projects, or two (2) each, which shall be accepted in lieu of the remaining required similar consu
Description
REQUEST FOR EXPRESSIONS OF INTEREST Consulting Services for the Project Implementation Consultant (PIC) for the Technical Validation, Detailed Architectural and Engineering Design, and Construction Supervision of Luzon Schools – PIC 1 under IBRD Loan No. 97040-PH: Infrastructure for Safer and Resilient Schools (ISRS) Project Country: Philippines Name of Project: Infrastructure for Safer and Resilient Schools (ISRS) Project Loan No.: IBRD Loan No. 97040-PH Assignment Title: Contract ID No. 2...
Dates
- Publication
- 16 juin 2026 à 20 h 00
- Date de clôture
- 8 juillet 2026 à 20 h 00
Comment soumissionner
Classification
Catégorie normalisée
Source: World Bank
Dernière modification : 2026-09-09 21 h 04 min 15 s
Actualisation toutes les 2 heures