Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
AB-2026-05544 (Raw Water Ponds)

Raw Water Storage Ponds - Request for Contractor Pre-qualifications

Mountain View Regional Water Services Commission · Innisfail, Alberta, Canada

Cet appel d’offres a fermé le 20 août 2026 à 10 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
AB-2026-05544 (Raw Water Ponds)
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
Raw Water Storage Ponds - Request for Contractor Pre-qualifications
Identifiant de la source
AB-2026-05544

Détails

Lieu
Innisfail, Alberta, Canada

Résumé

The MVRWSC Raw Water Storage Pond and Lift Station Project will implement a phased off stream raw water storage pond on Commission-owned lands east of the WTP. The existing intake and low-lift pump station will remain in service and will deliver raw water to the new pond system, maintaining established conveyance routes and minimizing disruption. A new raw water lift station and flow-control chamber will return stored water from the pond to the WTP. At full build-out the pond will comprise three storage cells and a dedicated forebay, constructed in phases from west to east, providing a total storage volume of approximately 360,000 m³, equivalent to approximately 24 to 47 days of supply depending on plant demand. The Anthony Henday WTP has an average day demand of approximately 10,000 m³/d, a maximum day demand of approximately 15,000 m³/d and a total plant capacity of 27,000 m³/d. Initial phases of the work have been intentionally planned to avoid in-river construction, streamlining regulatory approvals and reducing environmental risk. The Commission plans to tender the Phase 1 civil contract work following completion of this pre-qualification process, once draft design drawings are available. The intent of this pre-qualification process is to allow the Commission to rate, rank and select up to five (+/-) eligible General Contractors that will be invited to bid the necessary services to construct Phase 1 of the Project. A separate pre-qualification package is anticipated for future phases of the work. Through this request for pre-qualification application, the Commission seeks to ensure that companies that bid on the above contract have the experience, skill, ability, resources, bonding, integrity and safety record needed to perform the above work as described in this package and to specify the requirements that would govern any resulting contractual agreement(s). Commodity: Heavy construction machinery and equipment, Earth moving machinery, Earthworks engineering

Description

The MVRWSC Raw Water Storage Pond and Lift Station Project will implement a phased off stream raw water storage pond on Commission-owned lands east of the WTP. The existing intake and low-lift pump station will remain in service and will deliver raw water to the new pond system, maintaining established conveyance routes and minimizing disruption. A new raw water lift station and flow-control chamber will return stored water from the pond to the WTP. At full build-out the pond will comprise three...

Dates

Publication
6 août 2026 à 09 h 36
Date de clôture
20 août 2026 à 10 h 00

Comment soumissionner

Classification

Catégories NIBS

221000002210150081101522

Catégorie normalisée

Construction & Infrastructure

Source: Alberta Purchasing

Dernière modification : 2026-09-09 21 h 04 min 30 s

Actualisation toutes les 2 heures