Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Raw Water Pipeline - Condition Assessment
City of Lloydminster · Lloydminster, Alberta, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- AB-2026-02875 (2641106)
- Organisme émetteur
- City of Lloydminster · Voir l'historique des attributions →
- Palier de gouvernement
- Municipal
- Type d’appel d’offres
- Environmental Services
- Titre
- Raw Water Pipeline - Condition Assessment
- Source
- Alberta Purchasing
- Identifiant de la source
- AB-2026-02875
Détails
- Lieu
- Lloydminster, Alberta, Canada
Résumé
The City of Lloydminster (City) is requesting submissions from qualified Vendors to complete the inspection, condition assessment, and mapping of its Raw Water Supply Pipeline that supplies water to the Water Treatment Plant (WTP) from the North Saskatchewan River. The existing pipeline is a 750 mm diameter yellow jacketed, cement lined, steel pipe with a design capacity of 694 L/sec. The City intends to undertake non-destructive condition assessment of the raw water transmission pipeline to better understand its structural condition, estimate remaining service life, and obtain the information required to support future maintenance, rehabilitation, or replacement planning. Commodity: Material Handling and Conditioning and Storage Machinery and their Accessories and Supplies, Containers and storage, Tanks and cylinders and their accessories, Water storage tanks, Industrial filtering and purification, Water purification system, Water and wastewater treatment supply and disposal, Water treatment and supply equipment, Water resources development and oversight, Water quality assessment services, Water quality management services, Environmental Services, Risk or hazard assessment, Environmental indicators analysis, Hydrology assessment service
Description
The City of Lloydminster (City) is requesting submissions from qualified Vendors to complete the inspection, condition assessment, and mapping of its Raw Water Supply Pipeline that supplies water to the Water Treatment Plant (WTP) from the North Saskatchewan River. The existing pipeline is a 750 mm diameter yellow jacketed, cement lined, steel pipe with a design capacity of 694 L/sec. The City intends to undertake non-destructive condition assessment of the raw water transmission pipeline to bet...
Dates
- Publication
- 9 avril 2026 à 11 h 56
- Date de clôture
- 7 mai 2026 à 10 h 00
Comment soumissionner
Classification
Catégories NIBS
Catégorie normalisée
Source: Alberta Purchasing
Dernière modification : 2026-09-09 21 h 04 min 31 s
Actualisation toutes les 2 heures