Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
General Contractors - Centre High Campus 4th and 5th Floor Renovation Project
Edmonton School Division · Alberta, Canada
Temps restant pour soumissionner
14j 20h 08m
Renseignements généraux
- Numéro de référence
- AB-2026-07669 (RFSQ-0430-2026)
- Organisme émetteur
- Edmonton School Division · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- General Contractors - Centre High Campus 4th and 5th Floor Renovation Project
- Source
- Alberta Purchasing
- Identifiant de la source
- AB-2026-07669
Détails
- Lieu
- Alberta, Canada
Résumé
Centre High Campus is located at 10050 MacDonald Drive in downtown Edmonton. The building was originally constructed as Alberta College Campus in the early to mid 1900s and consists of two interconnected multi-storey towers. The Division is undertaking a major renovation of the 4th, and 5th floors to modernize existing educational spaces, improve building functionality, and accommodate the operational needs of Centre High Campus. The project involves extensive interior renovations, including architectural modifications, mechanical, and electrical upgrades, and washroom improvements. The RFSQ is intended to shortlist a group of prospective general contractors who can demonstrate to the Division that they have the expertise, experience, and capacity to manage a complex, multi-trade renovation project within an aggressive timeline. The selected contractors must demonstrate their ability to coordinate construction activities in an occupied building, manage multiple trades, minimize disruptions to ongoing building operations, and maintain a safe environment for students, staff, and other occupants. The renovation will require careful construction planning, coordination, and sequencing due to the building’s existing infrastructure, and a year-round operation. Centre High Campus operates 12 months a year, offering continuous educational programming, including summer school. Contractors must demonstrate their ability to manage construction activities across multiple floors while minimizing disruptions to school operations, and maintaining safe access, essential building services, and safety measures throughout the project. Up to the top 5 highest scoring respondents (that meet the scoring Minimum Threshold) will be the selected respondents invited to the second-stage competitive process to bid on the project. As with any stipulated bid process the low compliant bid will be awarded the project. The Division will utilize the tender process for the second stage. The contract that will be utilized is the CCDC2 with the Division’s Supplementary Conditions. https://epsb.bonfirehub.ca/opportunities/113693 Commodity: Building and Facility Construction and Maintenance Services
Description
Centre High Campus is located at 10050 MacDonald Drive in downtown Edmonton. The building was originally constructed as Alberta College Campus in the early to mid 1900s and consists of two interconnected multi-storey towers. The Division is undertaking a major renovation of the 4th, and 5th floors to modernize existing educational spaces, improve building functionality, and accommodate the operational needs of Centre High Campus. The project involves extensive interior renovations, including arc...
Dates
- Publication
- 23 novembre 2026 à 10 h 48
- Date de clôture
- 14 décembre 2026 à 09 h 00
Comment soumissionner
Classification
Catégories NIBS
Catégorie normalisée
Source: Alberta Purchasing
Dernière modification : 2026-11-29 13 h 20 min 05 s
Actualisation toutes les 2 heures