All tenders
693C7326C000002
PROJECT NP NATR 5570-463P: THE PROJECT CONSISTS OF THE INSTALLATION OF ARCHITECTURAL STEEL POST AND MESH BARRIER SYSTEM ON THE NATCHEZ TRACE DOUBLE ARCH BRIDGE. THE WORK ON THE BRIDGE INCLUDES THE REMOVAL OF THE EXISTING TEMPORARY FENCE, REPAIR OF T
Department of Transportation · TN, United States
This contract has been awarded. Browse open opportunities
Time Left to Bid
Awarded
AwardedConstruction & InfrastructureFederal
Basic information
- Reference number
- 693C7326C000002
- Issuing organization
- Department of Transportation · Find award history →
- Government level
- Federal
- Solicitation type
- Construction & Infrastructure
- Title
- PROJECT NP NATR 5570-463P: THE PROJECT CONSISTS OF THE INSTALLATION OF ARCHITECTURAL STEEL POST AND MESH BARRIER SYSTEM ON THE NATCHEZ TRACE DOUBLE ARCH BRIDGE. THE WORK ON THE BRIDGE INCLUDES THE REMOVAL OF THE EXISTING TEMPORARY FENCE, REPAIR OF T
- Source
- usaspending
- Source ID
- CONT_AWD_693C7326C000002_6925_-NONE-_-NONE-
Details
- Location
- TN, United States
Description
PROJECT NP NATR 5570-463P: THE PROJECT CONSISTS OF THE INSTALLATION OF ARCHITECTURAL STEEL POST AND MESH BARRIER SYSTEM ON THE NATCHEZ TRACE DOUBLE ARCH BRIDGE. THE WORK ON THE BRIDGE INCLUDES THE REMOVAL OF THE EXISTING TEMPORARY FENCE, REPAIR OF T Awarded to: MC3 SOLUTIONS LLC Sub-agency: Federal Highway Administration Contract type: DEFINITIVE CONTRACT
Dates
- Publication
- 2025/12/09 12:00:00 AM UTC
- Closing date
- 2027/09/24 12:00:00 AM UTC
Estimated value
$5.8M USD
Classification
Normalized category
Construction & Infrastructure