Source language: English · A verified English summary is unavailable. Stored notice text is shown; consult the original documents.

All tenders
RFP-2025-6-4532

This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Hig

Highways & Public Works · Yukon, Canada

This tender closed on July 10, 2025 at 7:00 p.m.. Browse open opportunities
View Source

Time Left to Bid

Closed

ClosedConstruction & InfrastructureFederal

Basic information

Reference number
RFP-2025-6-4532
Government level
Federal
Solicitation type
Construction & Infrastructure
Title
This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Hig
Source
Yukon
Source ID
RFP-2025-6-4532

Details

Location
Yukon, Canada

Summary

This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Highway #5. The scope includes the design of scour protection measures at Clear Creek Bridge to address active foundation erosion, and a phased investigation program at Eagle River Bridge, comprising geotechnical investigations, structural assessments, and conceptual design development for stabilization of the bridge foundations, bearing assemblies, and approach infrastructure. The work will be done in the Traditional Territories of Na-cho Ny?k Dun, Tr'ond?k Hw?ch'in and Vuntut Gwitchin First Nation.

Description

This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Highway #5. The scope includes the design of scour protection measures at Clear Creek Bridge to address active foundation erosion, and a phased investigation program at Eagle River Bridge, comprising geotechnical investigations, structural assessments, and conceptual design development for stabilizatio...

Dates

Publication
June 16, 2025 at 10:00 a.m.
Closing date
July 10, 2025 at 7:00 p.m.

Classification

Normalized category

Construction & Infrastructure

Source: Yukon

Last updated 2026-11-29, 1:31:38 p.m.

Data refreshed every 2 hours