Source language: English · A verified English summary is unavailable. Stored notice text is shown; consult the original documents.

All tenders
AB-2026-04667 (27AGI055)

Carseland Diversion Sluicegate Sandblasting, Recoating, and Replacement of Seals

Agriculture and Irrigation · Alberta, Canada

This tender closed on August 5, 2026 at 10:00 a.m.. Browse open opportunities
View Source

Time Left to Bid

Closed

ClosedInformation TechnologyProvincial

Basic information

Reference number
AB-2026-04667 (27AGI055)
Government level
Provincial
Solicitation type
Information Technology
Title
Carseland Diversion Sluicegate Sandblasting, Recoating, and Replacement of Seals
Source ID
AB-2026-04667

Details

Location
Alberta, Canada

Summary

Project Background The Provincially owned Carseland Bow Headworks System provides an essential secured water supply for irrigation, industrial, municipal and domestic uses throughout the Bow and Oldman River drainage basins. This water supply system is valued at over $1 billion and is critical to support the local economy, provide safe drainage and flood control and ensure a secure water supply for the Bow River Irrigation District and 300,000 Acres of irrigated crop land. Project Objectives The Contractor will deliver the Services through Mechanical service technicians, QA/QC, and industry-standard reporting to Agriculture & Irrigation. The selected contractor will be responsible for the Sandblasting, recoating and installing new bottom seals on 2 radial gates. Project Structure/Business Model Operation and maintenance for this project is delivered from the Vulcan WIOB field office with management and technical support provided from the Calgary office. The area maintenance and operations Team Lead is located in Vulcan, and reports to the Bow Basin Operations & Infrastructure Manager located in Calgary, AB. Key Stakeholders The stakeholders and beneficiaries of this project include the Bow River Irrigation District (BRID), numerous private irrigators located throughout Southern Alberta, municipalities and industry who rely on this conveyance system to provide a secured water supply, directly supporting the local economy and the public of Alberta. Commodity: Industrial process machinery and equipment and supplies, Paint systems, Hydraulic systems and components, Tools and General Machinery, Hydraulic machinery and equipment, Structures and Building and Construction and Manufacturing Components and Supplies, Water resources development and oversight, Irrigation system maintenance and management services, Canal maintenance or management services, Specialized trade construction and maintenance services, Industrial painting service

Description

Project Background The Provincially owned Carseland Bow Headworks System provides an essential secured water supply for irrigation, industrial, municipal and domestic uses throughout the Bow and Oldman River drainage basins. This water supply system is valued at over $1 billion and is critical to support the local economy, provide safe drainage and flood control and ensure a secure water supply for the Bow River Irrigation District and 300,000 Acres of irrigated crop land. Project Objectives Th...

Dates

Publication
July 15, 2026 at 4:30 a.m.
Closing date
August 5, 2026 at 10:00 a.m.

How to bid

Classification

GSIN categories

2315000023153500251728002700000027120000300000007017000070171700701717017215000072151303

Normalized category

Information Technology

Source: Alberta Purchasing

Last updated 2026-09-09, 8:58:51 p.m.

Data refreshed every 2 hours