All tenders
693C7325F00021N

NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO

Federal Highway Administration · United States

This contract has been awarded. Browse open opportunities
View Source

Time Left to Bid

Awarded

AwardedConstruction & InfrastructureFederal

Basic information

Reference number
693C7325F00021N
Government level
Federal
Solicitation type
Construction & Infrastructure
Title
NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO
Source ID
usa-693C7325F00021N

Details

Location
United States

Description

NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO Awarded to: CENTRAL SOUTHERN CONSTRUCTION CORP. Agency: Department of Transportation Sub-agency: Federal Highway Administration Award type: DELIVERY ORDER

Dates

Publication
2024/12/23 12:00:00 AM UTC
Closing date
2027/10/31 12:00:00 AM UTC

Estimated value

$2.3M USD

Classification

Normalized category

Construction & Infrastructure

Source: USASpending (Federal)

Last updated 2026-09-02, 1:16:29 a.m.

Data refreshed every 2 hours