This project consists of construction of approximately 16.3 kilometres of the Klondike Highway from kilometre 542.3 to kilometre 558.6. The work consists of but is not limited to: mobilization and dem

Highways & Public Works · Yukon, Canada

This tender closed on February 14, 2024 at 6:00 p.m.. Browse open opportunities
View Source

Time Left to Bid

Closed

ClosedConstruction & InfrastructureFederal

Basic information

Reference number
RFB-2023-10-3023
Government level
Federal
Solicitation type
Construction & Infrastructure
Title
This project consists of construction of approximately 16.3 kilometres of the Klondike Highway from kilometre 542.3 to kilometre 558.6. The work consists of but is not limited to: mobilization and dem
Source
Yukon
Source ID
RFB-2023-10-3023

Details

Location
Yukon, Canada

Summary

This project consists of construction of approximately 16.3 kilometres of the Klondike Highway from kilometre 542.3 to kilometre 558.6. The work consists of but is not limited to: mobilization and demobilization; traffic control; grubbing; clearing and salvage; stripping; drilling, blasting and rock excavation; constructing rock embankment, roadway excavation; constructing subgrade, sub-base and base courses; removal and disposal of existing corrugated steel pipe; removal and salvage of existing structural plate corrugated steel pipe; supplying and installing corrugated steel pipe and welded seam corrugated steel pipe; supplying and installing structural plate corrugated steel pipe; channel construction; producing, sorting, hauling and placing riprap; sorting, hauling and stockpiling riprap; supplying and applying calcium chloride; and environmental compliance. Community: Stewart Crossing Traditional Territory: First Nation of Na-Cho-Nyak Dun

Description

This project consists of construction of approximately 16.3 kilometres of the Klondike Highway from kilometre 542.3 to kilometre 558.6. The work consists of but is not limited to: mobilization and demobilization; traffic control; grubbing; clearing and salvage; stripping; drilling, blasting and rock excavation; constructing rock embankment, roadway excavation; constructing subgrade, sub-base and base courses; removal and disposal of existing corrugated steel pipe; removal and salvage of existing...

Dates

Publication
December 18, 2023 at 10:00 a.m.
Closing date
February 14, 2024 at 6:00 p.m.

Classification

Normalized category

Construction & Infrastructure

Source: Yukon

Last updated 2026-09-02, 12:03:19 p.m.

Data refreshed every 2 hours