Source language: English · A verified English summary is unavailable. Stored notice text is shown; consult the original documents.

All tenders
AB-2026-05748 (WATER MODEL & MASTER PLAN UPDATE)

UTILITIES MASTER PLAN UPDATE

Town of Peace River · Peace River, Alberta, Canada

This tender closed on September 16, 2026 at 5:59 a.m.. Browse open opportunities
View Source

Time Left to Bid

Closed

ClosedProfessional & Consulting ServicesMunicipal

Basic information

Reference number
AB-2026-05748 (WATER MODEL & MASTER PLAN UPDATE)
Government level
Municipal
Solicitation type
Professional & Consulting Services
Title
UTILITIES MASTER PLAN UPDATE
Source ID
AB-2026-05748

Details

Location
Peace River, Alberta, Canada

Summary

The Town of Peace River is seeking proposals from qualified professional engineering consulting firms to update its 2010 Utility Master Plan for the Town’s water distribution system. The work will include assessment of the existing water distribution system, updating and calibrating the hydraulic water model, evaluating current and future system capacity and development needs, identifying deficiencies and required infrastructure improvements, developing servicing concepts and conceptual costs, and preparing a 15-year capital improvement plan with priorities. Examine existing infrastructure capacity and functionality. Determine existing system capacity and ability to support future development. Determine current demands, system condition and regulatory requirements. Review available planning information. Evaluate and prioritize improvements to existing infrastructure. Evaluate future demands based on projected development, growth patterns and population projections. Provide conceptual design requirements and cost estimates for identified deficiencies. Provide an updated water distribution system model. Provide boundary design conditions for new development areas. Develop a 15-year capital improvement plan with priorities and triggers for improvements. Provide guidance on operation and maintenance of existing infrastructure. Provide draft and final reports and all collected project data. Commodity: Water resources development and oversight, Water resource development service, Water resources planning services, Ground or surface water modeling services, Professional engineering services, Civil engineering, Water and sewer utilities, Water resource management, Water distribution management, Town water

Description

The Town of Peace River is seeking proposals from qualified professional engineering consulting firms to update its 2010 Utility Master Plan for the Town’s water distribution system. The work will include assessment of the existing water distribution system, updating and calibrating the hydraulic water model, evaluating current and future system capacity and development needs, identifying deficiencies and required infrastructure improvements, developing servicing concepts and conceptual costs, a...

Dates

Publication
August 14, 2026 at 4:33 p.m.
Closing date
September 16, 2026 at 5:59 a.m.

How to bid

Classification

GSIN categories

70170000701715007017150270171506811000008110150083101500831015028310150483101508

Normalized category

Professional & Consulting Services

Source: Alberta Purchasing

Last updated 2026-11-25, 4:20:42 a.m.

Data refreshed every 2 hours