Source language: English · A verified English summary is unavailable. Stored notice text is shown; consult the original documents.
REPAIR CONDUIT FROM BELOW CEILING AND INSTALL NEW CONDUIT FROM EXISTING FUSE BUCKET TO THE LINE SIDE OF THE CONTROL PANEL. REPAIR LEAK IN HOT WATER PIPE ON THE 42ND FLOOR AT JCK FEDERAL BUILDING IL0236FC 230 S. DEARBORN ST. CHICAGO, IL 60604
General Services Administration · IL, United States
Time Left to Bid
Awarded
Basic information
- Reference number
- 47PE5426F0280
- Issuing organization
- General Services Administration · Find award history →
- Government level
- Federal
- Solicitation type
- Construction & Infrastructure
- Title
- REPAIR CONDUIT FROM BELOW CEILING AND INSTALL NEW CONDUIT FROM EXISTING FUSE BUCKET TO THE LINE SIDE OF THE CONTROL PANEL. REPAIR LEAK IN HOT WATER PIPE ON THE 42ND FLOOR AT JCK FEDERAL BUILDING IL0236FC 230 S. DEARBORN ST. CHICAGO, IL 60604
- Source
- usaspending
- Source ID
- CONT_AWD_47PE5426F0280_4740_47PF0022A0012_4740
Details
- Location
- IL, United States
Summary
REPAIR CONDUIT FROM BELOW CEILING AND INSTALL NEW CONDUIT FROM EXISTING FUSE BUCKET TO THE LINE SIDE OF THE CONTROL PANEL. REPAIR LEAK IN HOT WATER PIPE ON THE 42ND FLOOR AT JCK FEDERAL BUILDING IL0236FC 230 S. DEARBORN ST. CHICAGO, IL 60604 Awarded to: JONES LANG LASALLE AMERICAS, INC. Sub-agency: Public Buildings Service Contract type: BPA CALL
Description
REPAIR CONDUIT FROM BELOW CEILING AND INSTALL NEW CONDUIT FROM EXISTING FUSE BUCKET TO THE LINE SIDE OF THE CONTROL PANEL. REPAIR LEAK IN HOT WATER PIPE ON THE 42ND FLOOR AT JCK FEDERAL BUILDING IL0236FC 230 S. DEARBORN ST. CHICAGO, IL 60604 Awarded to: JONES LANG LASALLE AMERICAS, INC. Sub-agency: Public Buildings Service Contract type: BPA CALL
Dates
- Publication
- July 6, 2026 at 8:00 p.m.
- Closing date
- September 29, 2026 at 8:00 p.m.
Estimated value
$12K USD
Classification
Normalized category