Source language: English · A verified English summary is unavailable. Stored notice text is shown; consult the original documents.

All tenders
UKPACT_ED09

Developing a tool for electric power system cost simulation in the Philippines

PALLADIUM INTERNATIONAL LIMITED · United Kingdom

This contract has been awarded. Browse open opportunities
View Source

Time Left to Bid

Awarded

AwardedEnvironmental ServicesFederal

Basic information

Reference number
UKPACT_ED09
Government level
Federal
Solicitation type
Environmental Services
Title
Developing a tool for electric power system cost simulation in the Philippines
Source ID
a9c7fc33-7240-4906-aade-70505a321c00-894114

Details

Location
United Kingdom

Summary

The Philippines has set ambitious targets to increase the share of renewable energy in its power generation mix to 50% by 2040. As the country expands its use of clean energy sources such as solar, wind, and hydropower, regulatory bodies require more advanced tools to assess the system-wide and consumer-level impacts of this transition. This RFQ seeks a supplier to support the Energy Regulatory Commission (ERC) in developing a tailored power system cost simulation tool. The tool will enable ERC to analyze the impacts of different renewable energy scenarios on overall system costs and electricity tariffs, helping to guide evidence-based regulatory decisions. The supplier will work closely with ERC to co-design the tool, gather and validate data, run scenario simulations, and deliver training workshops. The intervention aims to strengthen ERC's capacity to assess future renewable energy investments and support an inclusive, sustainable energy transition aligned with national policy goals.

Description

The Philippines has set ambitious targets to increase the share of renewable energy in its power generation mix to 50% by 2040. As the country expands its use of clean energy sources such as solar, wind, and hydropower, regulatory bodies require more advanced tools to assess the system-wide and consumer-level impacts of this transition. This RFQ seeks a supplier to support the Energy Regulatory Commission (ERC) in developing a tailored power system cost simulation tool. The tool will enable ERC...

Dates

Publication
April 22, 2026 at 10:28 a.m.
Closing date
July 14, 2025 at 4:00 a.m.

Estimated value

$136K GBP

Classification

Normalized category

Environmental Services

Source: Contracts Finder (UK)

Last updated 2026-09-02, 12:06:48 p.m.

Data refreshed every 2 hours