Source language: English · A verified English summary is unavailable. Stored notice text is shown; consult the original documents.
THE 31 ROAD IS A MAIN PAVED ROAD WITH HIGH SPEEDS OF TRAVEL. DURING THE FALLS FIRE, THE ASPHALT ROAD SURFACE DEGRADED SIGNIFICANTLY CAUSING SERIOUS POTHOLES IN THE ASPHALT, SOME OVER A FOOT DEEP, CREATING HAZARDS TO ROAD USERS. THIS WORK WILL REPAIR
Forest Service · United States
Time Left to Bid
Awarded
Basic information
- Reference number
- 12363N26F4047
- Issuing organization
- Forest Service · Find award history →
- Government level
- Federal
- Solicitation type
- Construction & Infrastructure
- Title
- THE 31 ROAD IS A MAIN PAVED ROAD WITH HIGH SPEEDS OF TRAVEL. DURING THE FALLS FIRE, THE ASPHALT ROAD SURFACE DEGRADED SIGNIFICANTLY CAUSING SERIOUS POTHOLES IN THE ASPHALT, SOME OVER A FOOT DEEP, CREATING HAZARDS TO ROAD USERS. THIS WORK WILL REPAIR
- Source
- USASpending (Federal)
- Source ID
- usa-12363N26F4047
Details
- Location
- United States
Summary
THE 31 ROAD IS A MAIN PAVED ROAD WITH HIGH SPEEDS OF TRAVEL. DURING THE FALLS FIRE, THE ASPHALT ROAD SURFACE DEGRADED SIGNIFICANTLY CAUSING SERIOUS POTHOLES IN THE ASPHALT, SOME OVER A FOOT DEEP, CREATING HAZARDS TO ROAD USERS. THIS WORK WILL REPAIR Awarded to: HUECKMAN CONTRACTING LLC Agency: Department of Agriculture Sub-agency: Forest Service Award type: BPA CALL
Description
THE 31 ROAD IS A MAIN PAVED ROAD WITH HIGH SPEEDS OF TRAVEL. DURING THE FALLS FIRE, THE ASPHALT ROAD SURFACE DEGRADED SIGNIFICANTLY CAUSING SERIOUS POTHOLES IN THE ASPHALT, SOME OVER A FOOT DEEP, CREATING HAZARDS TO ROAD USERS. THIS WORK WILL REPAIR Awarded to: HUECKMAN CONTRACTING LLC Agency: Department of Agriculture Sub-agency: Forest Service Award type: BPA CALL
Dates
- Publication
- March 15, 2026 at 8:00 p.m.
- Closing date
- August 13, 2026 at 8:00 p.m.
Estimated value
$153K USD
Classification
Normalized category